Freitag, 17. April 2009

Vivan - Work in Progress 2

Hiho!

Altough slowly, Vivian advances. I knitted only a little during easter, but did something on tuesday. The decreases started in the large front cables so I'm nearly done with my decreases and have to decide where to change the needles to 4.5 mm size.

I'm planning to lenghten the body of the jacket again in the waist as I did for the hip section. So probably I will knit the extra twist in the cables with the smaller sized needles and go on in size 4.5 from there. But I have to knit some until I arrive at this point. I did 45 row as yet.

No pics today - not worth it yet.

Keine Kommentare: